April 2014 – Work has started on the first part of pre-construction on the 2 Pins site
![2 Pins car park](https://www.pinwherryandpinmore.org.uk/wp-content/uploads/Car-park-650x487.jpg)
Construction work started on the temporary car park
![2 Pins car park](https://www.pinwherryandpinmore.org.uk/wp-content/uploads/Drainage-650x365.jpg)
Work on laying the new surface water drain to remove the open ditch with ran across the site
April 2014 – Work has started on the first part of pre-construction on the 2 Pins site
Construction work started on the temporary car park
Work on laying the new surface water drain to remove the open ditch with ran across the site